|
|
|
|
|
|
|
|
|
|
|
|
BS 1377 : Part 4 : 1990 |
| Chalk crushing
value |
|
|
|
|
|
| Location |
|
|
|
Job ref. |
|
|
| |
|
|
|
Borehole/
Pit no. |
|
| Soil description |
|
|
|
Sample No. |
|
|
| |
|
|
|
Depth |
|
m |
| Test
method BS1377: Part 4: 1990: 6* |
|
|
|
|
| Initial sample
mass |
|
g |
|
|
|
| Mass retained
on 10mm sieve |
|
g |
|
|
|
| Percentage
retained on 10mm sieve |
|
|
|
|
| Moisture
content* |
|
% |
|
|
|
| Saturation
moisture content* |
|
% |
|
|
|
| Retained on
20mm/37.5mm* sieve |
g |
|
% |
|
| |
|
|
|
|
|
|
| Total
no. |
Penetration of protrusion mm |
|
|
|
| |
Specimen |
Specimen |
Specimen |
Specimen |
Specimen |
Specimen |
| of blows |
1 |
2 |
3 |
4 |
5 |
6 |
| 1 |
|
|
|
|
|
|
| 2 |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
|
| 4 |
|
|
|
|
|
|
| 5 |
|
|
|
|
|
|
| 6 |
|
|
|
|
|
|
| 7 |
|
|
|
|
|
|
| 8 |
|
|
|
|
|
|
| 9 |
|
|
|
|
|
|
| 10 |
|
|
|
|
|
|
| 20 |
|
|
|
|
|
|
| 30 |
|
|
|
|
|
|
| 40 |
|
|
|
|
|
|
| 50 |
|
|
|
|
|
|
| Chalk crushing value (CCV) |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| *If
required |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
Operator |
|
Checked |
|
Approved |
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Form 4D |
|
|
|
|
|
|
|
|